Pages

27 Jan 2012

PENANG SECOND BRIDGE PROJECT


Penang Second Bridge Project (P2x)

Previous proposed  erection method of  Box Girder segments for Penang Second bridge Project.  however the erection method using crane barge is too expensive and it was change to implemented movable launching girder. 

i just sharing an engineering knowledge among us. Enjoys.





Tiada ulasan:

Catat Ulasan